The Phoenix Process: Steps to NFA |
Phoenix internal project set-up performed |
Initial contact between Phoenix and the insured and/or claims adjustor |
Site investigation and delineation activities scheduled |
PROJECT PROCUREMENT |
SITE INVESTIGATION |
Rough site map drawn Soil borings advanced Soil/groundwater samples collected Underground storage tank and/or excavation inspected if present Site history obtained through homeowner questionnaire Third-party impact determination verified Site Investigation Report (SIR) issued within 72 hours of site investigation |
AutoCAD site maps generated that depict |
site location and sample locations with |
contaminant concentrations |
DRAFTING |
DELINEATION |
Soil/groundwater delineation perfomed |
ESTIMATING |
SIR & Delineation data reviewed, remedial |
scope of work generated, bids solicited. |
Phoenix generates a single remedial cost |
estimate to help you establish a reserve. |
PROJECT MANAGEMENT |
Remedial activities scheduled, authorization requests (OSC & PBR) submitted to the NJDEP, |
contractors retained, Phoenix personnel assigned to oversee contractors, |
engineering drawings procured, soil and groundwater samples collected. |
COMPLIANCE |
Regulatory compliance sampling conducted for |
groundwater treatment systems (OSC/PBR) |
Monitoring well installations scheduled & |
supervised |
Post-remedial groundwater sampling conducted |
Post-excavation soil samples collected |
REPORTING |
Based on information provided by |
project management & compliance, |
Remedial Action Reports (RARs) are |
generated and submitted to the insured, |
state regulatory agency, and you, |
our client. |
No Further Action |